Calculator · Karnataka rates as of November 2026
Ready-to-move or under-construction: which costs less?
An under-construction flat is usually cheaper on paper. But it carries 5% GST, you keep paying rent until possession, and the bank charges interest on what it has paid the builder. Put both options side by side.
How this is worked out
- Ready flat: price + stamp duty and registration. No GST, and you stop paying rent the day you buy.
- Under construction: price + 5% GST (1% if affordable) + stamp duty and registration + the rent you keep paying until possession (rising each year) + interest during construction.
- Interest during construction: on a home loan of RBI's maximum share of the price, assuming about half of it is paid out on average until possession.
It doesn't count what the under-construction home may gain in value before possession, or the risk of delays. Add a buffer to the years if the builder's track record is mixed.
Questions buyers ask
Is an under-construction flat cheaper than a ready one?
The price is usually lower, but you pay 5% GST on it, keep paying rent until possession, and pay interest on the loan amount released during construction. The calculator adds all three so you can compare the real cost.
Is there GST on a ready-to-move flat?
No, not once the Occupancy Certificate (OC) has been issued. A flat bought after the OC, including a resale flat, carries no GST.
What is pre-EMI interest?
With a construction-linked plan, the bank pays the builder in stages and charges interest only on the amount paid out so far. Until possession you pay just that interest (pre-EMI), which does not reduce the loan. The calculator assumes about half the loan is out on average during construction.
What if possession is delayed?
Add the delay to the years until possession. Each extra year adds rent and pre-EMI interest. RERA lets you claim interest from the builder for delays, but it can take time to recover.
Other calculators
Rates checked in November 2026. Figures are estimates to help you plan; your bank, the builder's cost sheet and the sub-registrar's office have the final numbers.