Compare
ESC to close

Start typing to search properties...

Email
Call
WhatsApp

Nambiar Builders, Dommasandra, off Sarjapur Road

Nambiar District 25 (Nambiar D25)

Nambiar Builders' 100-acre township off Sarjapur Road: three RERA phases of 2 to 4.5 BHK homes from about ₹1.46 Cr, a 2.5 lakh sq ft Club SOHO and a 20-acre sports district. Completion 2030–32.

Also known as Nambiar D25, District25, Nambiar District25, Sports District @ Nambiar District25, Nambiar District 25 Sarjapur Road, Club SOHO D25

Price
₹1.46 Cr – ₹4.2 Cr
Homes
2, 3, 4 & 4.5 BHK apartments
Status
Under construction
RERA
3 registrations, 2025–26

Researched by Proplisto Research · checked against Karnataka RERA records and developer material · updated · 9 sources.

Nambiar District 25 – Dommasandra, off Sarjapur Road
13 photos

About Nambiar District 25

Nambiar District 25 — "D25" or "District25" — is Nambiar Builders' township at Muthanallur Cross on the Chandapura–Dommasandra Road, about 1 km off Sarjapur Road. Nambiar describes it as a 100-acre township with 85% open space, a 2.5 lakh sq ft clubhouse (Club SOHO) and a 20-acre sports zone with a FIFA-size football pitch and a cricket practice stadium.

It is being built in three RERA phases of high-rise towers with just 4 homes per floor: Phase 1 (6 towers, 796 homes, due 26 January 2030), Phase 2 (6 towers, 816 homes, due 31 August 2030) and Phase 3, the Sports District (8 towers, registered May 2026, indicated February 2032). Homes are 2, 3, 4 and 4.5 BHK from about 1,243 to 2,995 sq ft.

October 2026 quotes start at about ₹1.46–1.70 Cr for a 2 BHK and reach about ₹4.2 Cr for a 4.5 BHK — roughly ₹12,250–13,400 per sq ft. The proposed Muthanalluru Cross station on the Hebbal–Sarjapur metro line is about 600 m away, but that line still awaits central approval.

Highlights

  • Three RERA phases, all numbers published, no litigation or complaints listed for Phases 1–2
  • Only 4 homes per floor, with 3 passenger lifts and 1 service lift per tower
  • 2.5 lakh sq ft Club SOHO and a 20+ acre sports district
  • 85% open space, 3,500+ native trees and a 4 km cycling and jogging loop
  • About 600 m from the proposed Muthanalluru Cross metro station (Hebbal–Sarjapur line)
  • Wide range: 2 BHK from about ₹1.46 Cr to 4.5 BHK of about 3,000 sq ft

Nambiar District 25 at a glance

DetailValue
DeveloperNambiar Builders; RERA promoter (Phases 1–2) Nambiar EnsembleResidential Projects LLP
LocationMuthanallur Cross, Dommasandra village, off Sarjapur Road, Anekal Taluk 562125
TownshipAbout 100 acres (Nambiar)
Phases3 RERA phases, about 20 towers
Homes796 (Phase 1) + 816 (Phase 2) = 1,612; Phase 3 count not published
FloorsPhases 1–2 about G+32/33; Phase 3 up to G+36/38
Homes per floor4
Configurations2, 3 (2 or 3 toilets), 4 and 4.5 BHK
SizesAbout 1,243 – 2,995 sq ft super built-up
ClubhouseClub SOHO, 2.5 lakh sq ft
Open space85% (Nambiar)
Price per sq ftAbout ₹12,250 – ₹13,400 (Oct 2026)

Phases and RERA registrations

PhaseRERA numberTowersHomesHomes on offerRERA completion
Phase 1PRM/KA/RERA/1251/308/PR/100125/00737767962, 3, 3.5, 4, 4.5 BHK26 Jan 2030
Phase 2PRM/KA/RERA/1251/308/PR/200825/00801168162, 3, 4 BHK31 Aug 2030
Phase 3 – Sports DistrictPRM/KA/RERA/1251/308/PR/260526/0086868not published2, 2.5, 3, 4, 4.5 BHKabout Feb 2032 (portal)

Phase 1 and 2 dates are from the RERA records; the Phase 3 completion date is from Housiey and has not been checked against the RERA certificate. Some channel partners quote a December 2028 target for Phase 1, earlier than its RERA date.

Possession date

Developer targetDec 2028 target for Phase 1 (channel partners)
RERA completion date26 Jan 2030 · 31 Aug 2030 · about Feb 2032

Your date depends on the phase. In May 2026, Towers 1–12 (Phases 1–2) were at basement to ground-slab stage.

Nambiar District 25 price

ConfigurationSize (super built-up)Carpet areaPrice (Aug–Oct 2026, all-in)
2 BHK1,244 – 1,266 sq ftabout 811 sq ft₹1.65 Cr – ₹1.70 Cr
3 BHK (2 toilets)1,455 – 1,498 sq ftabout 964 sq ft₹1.92 Cr – ₹2.01 Cr
3 BHK (3 toilets)about 1,683 sq ftnot publishedabout ₹2.26 Cr
3 BHK (3 toilets + powder room)2,043 – 2,051 sq ftabout 1,303 sq ft₹2.70 Cr – ₹2.75 Cr
4 BHK2,561 – 2,583 sq ftabout 1,649 sq ft₹3.47 Cr – ₹3.50 Cr
4.5 BHK (4 bed + 5 toilets)2,936 – 2,995 sq ftabout 1,958 sq ft₹3.94 Cr – ₹4.20 Cr
Sports District · 2 BHK1,260 sq ft838 sq ft₹1.68 Cr
Sports District · 2.5 BHK1,518 sq ft1,009 sq ft₹2.03 Cr
Sports District · 4 BHK2,613 sq ft1,736 sq ft₹3.60 Cr
Sports District · 4.5 BHK2,980 sq ft1,910 sq ft₹4.05 Cr

All-inclusive quotes in August–October 2026: 2 BHK about ₹1.65–1.70 Cr, 3 BHK about ₹1.92–2.75 Cr, 4 BHK about ₹3.5 Cr and 4.5 BHK about ₹3.94–4.20 Cr. Square Yards' base-price range is ₹1.46–3.08 Cr. That works out to about ₹12,250–13,400 per sq ft.

Full price list with all-in cost estimate

Nambiar District 25 floor plans

All floor plans and carpet areas

Nambiar District 25 location

At Muthanallur Cross on the Chandapura–Dommasandra Road, about 1–1.3 km off Sarjapur Road: 600 m from the proposed metro station, 4.3 km from Wipro Kodathi, about 7.6 km from Electronic City and about 12.6 km from ITPL.

PlaceDistanceNote
Proposed Muthanalluru Cross metro stationabout 600 mNambiar
Sarjapur Main Road1 – 1.3 km
Divine Providence School1.3 kmSquare Yards
Wipro, Kodathi4.3 kmHousiey
Decathlon, Sarjapur Road5 kmHousiey
Electronic Cityabout 7.6 km straight line
Nearest working metro (Yellow Line)about 8 km

All distances and infrastructure status

Amenities

  • Club SOHO clubhouse, 2.5 lakh sq ft
  • FIFA-size football pitch and cricket practice stadium
  • 8 badminton, 5 tennis and 5 pickleball courts
  • 11-acre playground within the 20+ acre sports district
  • 4 km cycling and jogging loop
  • 125+ amenities in all (Nambiar)

About the developer: Nambiar Builders

Nambiar Builders has built on Sarjapur Road since 2009 — Nambiar Bellezea (villas, completed), Ellegenza Phase 1 (completed), Millenia (nearing completion) and Ellegenza Purple Crest (under construction). District 25 won "Integrated Township of the Year" at the Times Business Awards 2025.

The RERA promoter for Phases 1 and 2 is Nambiar EnsembleResidential Projects LLP. The RERA records show no land litigation or complaints for Phases 1 and 2. Note that District 25's 33–38-floor towers are taller than anything Nambiar has delivered so far.

Pros and cons

What works

  • All three phases RERA registered, with no complaints listed for Phases 1–2
  • Only 4 homes per floor, with 4 lifts per tower
  • Exceptional sports and club facilities for the price
  • 85% open space and a 4 km loop inside a 100-acre township
  • Proposed metro station 600 m away, if the line is approved

What to weigh

  • Completion from 2030 to about 2032
  • The metro is not yet approved; the working metro is about 8 km away
  • Priced above the Dommasandra average
  • Very large supply across three phases, so more resale competition
  • Carpet area about 64–67% of the sale area; kitchens without counters

Read the full review

Nambiar District 25 video walkthrough

Latest updates on Nambiar District 25

  1. Page published with all three RERA phases.

  2. HomznSpace prices: 2 BHK ₹1.70 Cr to 4.5 BHK ₹3.94 Cr.

  3. Square Yards average ₹13,100 per sq ft.

  4. Phase 3 "Sports District" on sale (Housiey); a ₹1,900 Cr Phase III investment was also reported.

  5. Phase 3 registered: PRM/KA/RERA/1251/308/PR/260526/008686.

  6. Towers 1–12 at basement-to-ground-slab stage.

  7. Phase 2 registered: PRM/KA/RERA/1251/308/PR/200825/008011.

  8. Phase 1 excavation begins.

  9. Phase 1 registered: PRM/KA/RERA/1251/308/PR/100125/007377.

Nambiar District 25: frequently asked questions

What is the price of Nambiar District 25?

2 BHK homes start at about ₹1.46–1.70 Cr and 4.5 BHK homes go to about ₹4.2 Cr (portal quotes, August–October 2026), about ₹12,250–13,400 per sq ft.

What is the RERA number of Nambiar District 25?

Phase 1 is PRM/KA/RERA/1251/308/PR/100125/007377, Phase 2 is PRM/KA/RERA/1251/308/PR/200825/008011 and Phase 3 (Sports District) is PRM/KA/RERA/1251/308/PR/260526/008686.

When is the possession of Nambiar District 25?

RERA completion is 26 January 2030 for Phase 1 and 31 August 2030 for Phase 2. Phase 3 is listed for about February 2032.

Where is Nambiar District 25 located?

At Muthanallur Cross on the Chandapura–Dommasandra Road, Dommasandra village, off Sarjapur Road, Anekal Taluk, Bengaluru 562125.

What configurations are available in Nambiar District 25?

2, 3 (2 or 3 toilets), 4 and 4.5 BHK (4 bedrooms, 5 toilets) apartments, from about 1,243 to 2,995 sq ft.

What does D25 mean?

D25 is short for Nambiar District 25, styled "District25" by the developer.

How many phases does Nambiar District 25 have?

Three so far: Phase 1 (6 towers, 796 homes), Phase 2 (6 towers, 816 homes) and Phase 3, the Sports District (8 towers).

How big is Nambiar District 25?

Nambiar calls it a 100-acre township with 85% open space and a 2.5 lakh sq ft clubhouse, Club SOHO.

Is there a metro near Nambiar District 25?

A Muthanalluru Cross station is proposed about 600 m away on the Hebbal–Sarjapur line, which still awaits central approval. The nearest working metro, the Yellow Line, is about 8 km away.

Is Nambiar District 25 a good investment?

It has registered phases, exceptional sports and green spaces and possible future metro access, but possession is 2030 or later and prices are above the local average, so it suits buyers with a five-year-plus horizon.

Sources

Proplisto is an independent property platform, not the developer. Figures are compiled from RERA records, developer material and public listings as of the date above; where sources disagree we show the range. Confirm the final price, specifications and RERA details with the developer before booking.

Get price sheet